From major power station outages to precision pressure piping packages — a selection of our recent project work.

A major $2.5M pressure piping package for the No.6 Blast Furnace Reline at BlueScope Steel, Port Kembla NSW. Perera Engineering was engaged to fabricate and install the gas cleaning pipework — a critical high-pressure system requiring full weld documentation, NDT, and strict schedule compliance.

Perera Engineering delivered the MCL7 pipework package as part of a planned outage at Mount Piper Power Station. Working within a tight outage window, our team fabricated and installed all pipework on schedule, enabling the plant to return to service on time.

Mobilised to Queensland for a planned outage at Millmerran Power Station. The scope included fabrication and installation of replacement pipe spools, with all work completed to specification within the outage window.

Works at the Tallawarra B Power Station project involved the fabrication and supply of pipe bends, spools, and associated fittings for the facility. All fabrication was conducted at our Unanderra workshop with full QA documentation.